World Headquarters
339 N Front St
Camden
NJ 08102
Contact
Quick Links
© Copyright 2024 DCM AE. All right reserved.
NUTLEY, NJ
The project consisted of two phases: the renovation of the original building and the new expansion. DCM relocated the gym to the new addition and designed an extra floor to house a larger cafeteria to serve 400 students as well as a media library. This allowed the school to offer extra-curricular art and sporting activities. The renovated academic spaces in the original building received new modern infrastructure, energy efficient lighting and new equipment. Although the building grew, due to the energy efficiency improvements, the gas consumption was reduced! Another DCM engineering success!
Client: Nutley Board of Education
Year(s): 2007 – 2009
Location: Nutley, NJ
Project Area: 136,000 SQ FT
Project Type: Renovation and Expansion
Role: Architect, Interior Designer, District Master Planner (Long Range Facility Plan), Mechanical, Electrical and Plumbing Engineer
339 N Front St
Camden
NJ 08102
© Copyright 2024 DCM AE. All right reserved.